Enameled steel bathtubs have not lost their relevance even with the advent of comfortable acrylic models on the market. Inexpensive, relatively easy types of plumbing, with a careful attitude, serve 20 or more years. However, they have features that you should know for proper installation and connection. Do you agree?
If you plan to install a steel bath with your own hands, then you need to clearly know the technological rules for working with metal containers and master the intricacies of the connection. We will tell you how they are carried out, what measures should be taken in preparing the premises for the upcoming work. We list common errors.
The choice of plumbing and fittings
Initially, you need to choose a model that is suitable in size and shape. If the bathroom is spacious, then there are no special configuration requirements, but for space-limited rooms it is better to focus on compact or corner products.
In the plumbing stores, a line of plumbing fixtures of standard dimensions from 1 m to 2 m in length and from 0.7 m to 1 m in width is presented.
Image Gallery
Photo from
2 m long for a large bathroom
Average size - from 1.5 m to 1.7 m
Minimum bathtub length - 1 m
Ability to install additional options
Together with the device, it is necessary to purchase fittings for connecting to the sewer network. Drainage devices differ in their designs, sizes, and material of manufacture.
Well-proven combination instruments made of polypropylene with a water seal and a corrugated overflow pipe. Visible parts can have a different shade (white, silver, gold), they are usually chosen in accordance with the color of the mixer.
Preparation of premises for installation
The process of preparing the surfaces of walls and floors for installing a pre-selected steel bath can begin even before the acquisition, but much depends on the purpose of the repair.
If the old plumbing fixture is replaced with a new one, but with the same bowl size, then the activities are reduced to cleaning. Another approach to overhaul, when the walls are faced with ceramic tiles or plastic.
It is reasonable to use ceramic tiles or make a floor under the bathroom if it is not planned to install a frame or screen. Otherwise, a good enough waterproofing and strong screed
It’s easier with plastic: the walls are fully finished, and then the bath is installed. Tiles come in many ways.
There are three options:
- facing installation;
- installation - facing;
- partial cladding - installation - cladding.
The latter option is relevant when the height of the bath is not exactly known or a small area is required to install the bowl on a frame attached to the wall. In this case, leave a free strip above the intended installation location of the bath, and after mounting the bowl, tiling it with tiles.
Steel Bath Installation Instructions
The plumbing fixture made of universal steel has a simple design: a metal bowl with two holes for draining and overflow plus four legs. Supports are attached by two blocks at both ends, bottom end with bolts for height adjustment. A standard steel bath can be installed both on the legs and on the support frame.
How to set the bowl on the legs?
First, consider the simplest option - installation on the legs with support for the simplest wooden frame. The role of the frame is played by three bars fixed directly on the wall.
The sequence of work is as follows:
- Unpacking the bowl, checking the integrity of the enamelled coating.
- Installation of legs, height adjustment.
- Marking work on the wall.
- Preparation and installation of wooden blocks on the wall.
- Processing timber and walls with sealant.
- Putting the bath in place.
- Sealing the gap sealant.
For work, you need a key for attaching legs, pliers, a hacksaw or a jigsaw for sawing up bars, sanitary sealant, protective impregnation for wood, a brush, a drill, self-tapping screws or dowels (depending on the nature of the wall material).
The first important step is screwing the legs to the base of the steel bowl.
Image Gallery
Photo from
Step 1 - checking the bath
Step 2 - fixing the legs to the mounting screws
Step 3 - Replace the Protective Gaskets
Step 4 - Leg Reinforcement Method
At the same stage, it is convenient to mount the drain fittings - decorative plates with a mesh, which are installed on the inside, a plastic siphon with a water seal and a drain leading to the sewer line.
Installation can be complicated by the fact that water pipes run around the room. It is necessary to make the bath stand firmly, without damaging the pipeline, and the tile, which will be glued later, would get a reliable foundation.
The best solution is to fix a contour from the bar along the perimeter above the pipes, which will support the bowl and protect the pipes. This will be the next step.
Image Gallery
Photo from
By the time the work starts, it is necessary to wall the wall (except for the area adjacent to the bathtub), completely finish the floor finish, check the pipe connections for leaks
Marking accuracy is a guarantee of reliability. We determine the exact location of the bath, and then we designate the fastening points of the wooden bars - we draw it with a marker
In order not to make a mistake with the width or length of the parts, we check their dimensions by attaching to the side of the bath. 3 elements are required - one long and two short
Being in a damp room, the wood swells and molds. To prevent this from happening, we cover each part with moisture-resistant impregnation
Ceramic tiles are mounted on a drywall, therefore, to fix the bars, not dowels will be used, but special self-tapping screws for drywall
Exactly along the marked lines, one after the other we fasten the bars with screws using a screwdriver. The installation of each part is checked by a laser level
To fix the bathtub along the entire circuit, we use sanitary sealant for bathrooms. We apply it on the surface of the bars and directly on the wall - at the level of the upper edge of the bath
We put the bath with pre-screwed legs in place so that the sides fit snugly on the wooden contour. We adjust the height of the legs, once again we pass along the perimeter with a sealant
Step 1 - preparing the installation site
Step 2 - marking on the wall
Step 3 - cutting wooden blocks
Step 4 - impregnation of wooden parts
Step 5 - drilling holes for screws
Step 6 - fastening the bars on the wall
Step 7 - applying sealant around the perimeter
Step 8 - putting the bath in place
It remains only to wall the wall. Plastic corners or other devices to mask the wall gap will not be required, since the tile will be glued butt. This option looks aesthetically pleasing and, unlike using a corner, the risk of yellowing or mold overgrowing completely disappears.
Brick frame mounting
The brick base is chosen for two reasons: the frame is durable and does not deform over time, its cost is relatively small.
Nothing depends on the choice of this or that type of bricks; you can use silicate, red refractory or solid. In addition, cement mortar will be required for the masonry and the material for the finish.
An option for mounting a steel bath, in which the brick frame is first erected around the perimeter, and only then the bath is installed. The main wall is not a carrier for the bowl
But there is a simpler way in which instead of a large base, two brick supports are made to replace the legs. The advantages of this option: a small amount of material, cost savings, work takes a minimum of time, cement sets quickly.
Step-by-step instructions for the manufacture of brick supports:
Step 1 - preparation of the premises for the installation of the bath. This type of installation requires the use of a decorative screen, so the screed can be left in its original state, without tiling.
Step 2 - marking work. In the instructions you can find the exact distance between the legs of the bowl, the same must be maintained between the centers of the racks. Mounting points are noted, observing the distance to the walls.
Step 3 - brickwork. Usually, three pairs of bricks on each side are enough for it, which are simply laid one on top of the other, without a traditional shift.
For masonry, you need a high-quality solution. To prepare it, you can use the assembly-brick mixture M200 or other material based on cement
Step 4 - plastering supports. Plaster increases the strength of the brick - thanks to additional protection, it becomes less hygroscopic and lasts longer.
A more reliable layer will turn out if you use a plaster grid. It will prevent cracking and shedding of the material and create an attractive look.
Step 5 - installation of the bath in place. On the upper surface of the supports we put a thick layer of mortar and mount the bath so that the unhardened cement mixture takes the form of a bottom.
With the same solution, we cover all the cracks in the place where the bowl is attached to the supports. So that the bathtub installed on the bricks was even and did not change its position, along the walls we also fix the perimeter of bars or a metal profile. When the solution finally dries, you can perform further finishing - finish wall repairs, install a screen.
Ways to design an installed bowl
If the bath belongs to budget models and a special frame with a screen is not designed for it, you need to make a decorative panel yourself. For its manufacture, various materials are used: ceramic tiles, mosaics, plastic, processed wood, plywood, drywall, etc.
Ready-made models made of plastic with sliding doors are popular. You can build a frame for fixing the position of the bath yourself, with the options and implementation schemes we will familiarize you with the article we recommend.
Image Gallery
Photo from
Plastic screen with storage sections
RPG plate shield
Ceramic tile
Lattice or blank screen from boards
In small bathrooms, installing a screen can visually make the room even more crowded. To prevent this from happening, you can use a light tile cladding or glossy materials. An excellent solution for limited space is a mirror screen, with the stages of construction of which we will introduce the article recommended by us.
Sliding doors provide access to the space under the bathroom, where you can store useful little things. Instead of doors, you can make a comfortable hatch.
List of Common Errors
Given that the bowl is installed for a long period, and sometimes "tightly" sits on sealant or polyurethane foam, you must carefully and accurately carry out all the stages of installation.
Here are the mistakes that residents most often encounter:
- Late installation of overflow and overflow. If the bathroom is already fixed in place, mounting the fittings is much more difficult, especially given the low landing of the bowl.
- Inaccurate leg height adjustment. It is very difficult to tighten the bolts when the bowl is already glued to the sealant. A special tool and additional efforts will be required.
- No gap between the floor and the screen. It’s very inconvenient to perform any actions while standing near the bathroom with a blank face wall.
- Loose foot mounts. Loosened nuts can weaken the structure. The bathtub does not fall to the floor, but can move to the side.
- Installation without taking into account the location of sewer pipes. If the outlet into the pipe is above the bottom of the bowl, draining the water will become difficult.
Some flaws lead to the fact that repairs have to be done unscheduled, and not only at home, but also at the neighbors. Unpleasant moments are associated with inaccurate sealing of the gap between the bathroom and the wall and with poor waterproofing of the floor under the bowl.
Sometimes they do not make preliminary soundproofing. It is not necessary for all steel baths, but if the stream of water makes a loud noise, the bottom from the bottom should be covered with foam. This can be done after installation.
In practice, there are many more options for installing bathtubs, and their choice depends on the rationality of a particular method. We offer videos in which professional masters share their secrets.
Video # 1. The role of silicone sealant in the installation of plumbing fixtures:
Video # 2. Tips for protecting a metal surface:
Video # 3. Step-by-step instructions from A to Z:
As you can see, even with such a seemingly simple event as installing a steel bath on legs or a frame, there are many interesting nuances. It is not always possible to do everything correctly the first time. But if you choose high-quality plumbing, and all installation rules are observed, using the bathroom is a pleasure.
Please write comments in the block form below. Tell us about how to install steel plumbing with your own hands. Share technological subtleties that may be useful to site visitors, ask questions, publish thematic photos.